Guide to Countering Unmanned Systems: Difference between revisions
init with tables Tag: wikieditor |
shell tables Tag: wikieditor |
||
Line 16: | Line 16: | ||
|} | |} | ||
== SWAP-C Table Key | == SWAP-C Table Key == | ||
# '''Size''': Dimensions of the system (e.g., length, width, height). | |||
# '''Weight''': Total weight of the system including payloads. | |||
# '''Power''': Power requirements and battery life. | |||
# '''Cost''': Overall cost including maintenance and operation. | |||
# '''Point of Contact''': Primary vendor contact for the system. | |||
# '''Remarks''': Additional comments or limitations about the system. | |||
== Key Phrases to Watch For == | == Key Phrases to Watch For == | ||
=== Look For (Good) === | === Look For (Good) === | ||
# | |||
# | |||
# | |||
# | |||
=== Watch Out For (Bad) === | === Watch Out For (Bad) === | ||
# | |||
# | |||
# | |||
# | |||
== Questions Leaders Should Be Asking == | == Questions Leaders Should Be Asking == | ||
# | |||
# | |||
# | |||
# | |||
== Actions for Technical Section or Consultant to Validate SUAS Claims == | == Actions for Technical Section or Consultant to Validate SUAS Claims == | ||
# | |||
# | |||
# | |||
# | |||
== Telltale Signs Leaders Should Be Aware Of == | == Telltale Signs Leaders Should Be Aware Of == | ||
Line 69: | Line 53: | ||
! '''Sign''' | ! '''Sign''' | ||
! '''Implication''' | ! '''Implication''' | ||
|- | |||
| | |||
| | |||
|- | |||
| | |||
| | |||
|- | |||
| | |||
| | |||
|} | |} | ||
[[Category:Login NotYet Required]] | |||
[[Category:]] | |||
[[Category:Anti-Drone Technology]] | [[Category:Anti-Drone Technology]] | ||
[[Category:Counter Unmanned Systems]] | [[Category:Counter Unmanned Systems]] |
Revision as of 01:51, 24 September 2024
Leader’s Guide to Counter Unmanned Systems
Training for Subordinates
Counter Unmanned Systems: Dealing with Vendors
SWaP-C Comparison Table for Counter Unmanned Systems
Model | Size (L x W x H) | Weight (kg) | Power (watts) | Cost (USD) | Point of Contact | Remarks |
---|
SWAP-C Table Key
- Size: Dimensions of the system (e.g., length, width, height).
- Weight: Total weight of the system including payloads.
- Power: Power requirements and battery life.
- Cost: Overall cost including maintenance and operation.
- Point of Contact: Primary vendor contact for the system.
- Remarks: Additional comments or limitations about the system.
Key Phrases to Watch For
Look For (Good)
Watch Out For (Bad)
Questions Leaders Should Be Asking
Actions for Technical Section or Consultant to Validate SUAS Claims
Telltale Signs Leaders Should Be Aware Of
Sign | Implication |
---|---|