Guide to Countering Unmanned Systems: Difference between revisions

From Irregularpedia
Jump to navigation Jump to search
init with tables
Tag: wikieditor
shell tables
Tag: wikieditor
Line 16: Line 16:
|}
|}


== SWAP-C Table Key: ==
== SWAP-C Table Key ==
{| class="wikitable sortable"
# '''Size''': Dimensions of the system (e.g., length, width, height).
! '''Attribute'''
# '''Weight''': Total weight of the system including payloads.
! '''Description'''
# '''Power''': Power requirements and battery life.
|-
# '''Cost''': Overall cost including maintenance and operation.
| '''Size'''
# '''Point of Contact''': Primary vendor contact for the system.
| Dimensions of the system in length, width, and height.
# '''Remarks''': Additional comments or limitations about the system.
|-
| '''Weight'''
| Total weight of the system including payloads.
|-
| '''Power'''
| Power consumption or battery life of the system.
|-
| '''Cost'''
| Overall cost including maintenance and operation.
|-
| '''Point of Contact'''
| Primary contact person for vendor or manufacturer.
|-
| '''Remarks'''
| Additional comments or considerations about the system.
|}


== Key Phrases to Watch For ==
== Key Phrases to Watch For ==
=== Look For (Good) ===
=== Look For (Good) ===
{| class="wikitable sortable"
#
! '''Phrase'''
#
! '''Explanation'''
#
|}
#


=== Watch Out For (Bad) ===
=== Watch Out For (Bad) ===
{| class="wikitable sortable"
#
! '''Phrase'''
#
! '''Explanation'''
#
|}
#


== Questions Leaders Should Be Asking ==
== Questions Leaders Should Be Asking ==
{| class="wikitable sortable"
#
! '''Question'''
#
! '''Why It's Important'''
#
|}
#


== Actions for Technical Section or Consultant to Validate SUAS Claims ==
== Actions for Technical Section or Consultant to Validate SUAS Claims ==
{| class="wikitable sortable"
#
! '''Action'''
#
! '''Goal'''
#
|}
#


== Telltale Signs Leaders Should Be Aware Of ==
== Telltale Signs Leaders Should Be Aware Of ==
Line 69: Line 53:
! '''Sign'''
! '''Sign'''
! '''Implication'''
! '''Implication'''
|-
|
|
|-
|
|
|-
|
|
|}
|}


 
[[Category:Login NotYet Required]]
 
[[Category:]] Login Required #will activate this when filled in
[[Category:Anti-Drone Technology]]
[[Category:Anti-Drone Technology]]
[[Category:Counter Unmanned Systems]]
[[Category:Counter Unmanned Systems]]

Revision as of 01:51, 24 September 2024

Leader’s Guide to Counter Unmanned Systems

Training for Subordinates

Counter Unmanned Systems: Dealing with Vendors

SWaP-C Comparison Table for Counter Unmanned Systems

Model Size (L x W x H) Weight (kg) Power (watts) Cost (USD) Point of Contact Remarks

SWAP-C Table Key

  1. Size: Dimensions of the system (e.g., length, width, height).
  2. Weight: Total weight of the system including payloads.
  3. Power: Power requirements and battery life.
  4. Cost: Overall cost including maintenance and operation.
  5. Point of Contact: Primary vendor contact for the system.
  6. Remarks: Additional comments or limitations about the system.

Key Phrases to Watch For

Look For (Good)

Watch Out For (Bad)

Questions Leaders Should Be Asking

Actions for Technical Section or Consultant to Validate SUAS Claims

Telltale Signs Leaders Should Be Aware Of

Sign Implication